Complete septic systems for new construction and replacements
Much of Tucson’s outskirts and most of rural Pima County is not on municipal sewer. If your lot is one of them, a septic system is part of building on it, and it has to be installed exactly as designed and permitted. G & J Excavating installs complete septic systems for new homes and replaces failing systems on existing properties.
What a complete septic installation includes
- Test pits for the soil evaluation. Dug where the engineer specifies so the system can be designed for the ground it will actually sit in.
- Plans and permits. We work with the engineer to get the design drawn and the Pima County permit approved.
- Tank excavation and placement. Excavating to the designed depth and setting the septic tank level on a prepared base.
- Leach field / drain field preparation. Excavating trenches or beds to the design dimensions and depth, placing aggregate or chamber systems, and installing distribution piping.
- Trenching for the building sewer line from the house to the tank and from the tank to the distribution system.
- Site grading related to the system. Finish grading over the tank and field so surface water drains away from the system.
- Replacement systems where an existing system has failed, including removal or abandonment of the old components as the permit requires.
- New construction septic systems installed in sequence with the pad, utilities and foundation.
Permits and inspections
Onsite wastewater systems in Pima County are permitted and inspected by the county, and every system needs an engineered design before a permit is issued. G & J works with the engineer to get the plans drawn and the permit approved, then installs the system to that approved design and coordinates the inspections the permit calls for. You get one point of contact from the first site visit to the final inspection instead of managing the engineer, the installer and the county separately.
Site evaluation and design
The size and type of system depends on the soil, the lot and the size of the home. It starts with test pits: we dig them where the engineer wants to look, so the soil profile and percolation can be evaluated in the actual leach field area. The engineer designs the system from that evaluation, and we build what the stamped plans show.
Why the excavation matters
A septic system is mostly an excavation project done to tight tolerances. Trench depth, level, spacing and the condition of the soil at the bottom of the excavation all affect how the system performs for the next twenty years. We treat it that way.
Septic installation is often part of a larger site preparation scope on a new home lot, alongside utility trenching and grading.